Close Menu
    What's Hot

    Oil prices surge past $90 then retreat on market shifts

    August 3, 2026

    Austria heatwave drives record high and €1.4bn damage

    August 3, 2026

    DR Congo faces its largest recorded Ebola outbreak

    August 3, 2026
    Facebook X (Twitter) Instagram
    Saudi IndependentSaudi Independent
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Saudi IndependentSaudi Independent
    Home » ADNOC Drilling awarded $2 billion for the Hail, Ghasha Development Project
    Business

    ADNOC Drilling awarded $2 billion for the Hail, Ghasha Development Project

    July 27, 2022
    Facebook Twitter Pinterest Reddit Telegram LinkedIn Tumblr VKontakte WhatsApp Email
    Share
    Facebook Twitter Reddit Pinterest Email

    In connection with the Hail and Ghasha Development Project, Abu Dhabi National Oil Company (ADNOC) announced the award of two large contracts totaling $2 billion (AED7.49 billion) to ADNOC Drilling. A total of $1.3 billion (AED4.89 billion) will be spent on integrated drilling services and fluids, and $711 million (AED2.6 billion) will be spent on providing four Island Drilling Units. ADNOC Logistics & Services was also awarded a third contract for offshore logistics and marine support services valued at $681 million (AED2.5 billion).

    ADNOC Drilling awarded $2 billion for the Hail, Ghasha Development ProjectIn total, more than 80% of the awards will flow back into the UAE’s economy as part of ADNOC’s successful In-Country Value (ICV) program. Each of the three contracts covers the Hail and Ghasha drilling campaign for a maximum of ten years. This project is part of the Ghasha Concession, which is the world’s largest offshore sour gas development and an important component of ADNOC’s integrated gas masterplan as well as an important enabler of UAE gas self-sufficiency.

    With the expansion of ADNOC’s liquified natural gas (LNG) capacity, ADNOC’s gas masterplan ensures a sustainable and economical supply of natural gas to meet the growing demands of the UAE and international markets. As part of the plan, new approaches and technologies will be applied to increase and improve gas recovery from existing fields, as well as develop untapped resources and leverage innovation to reduce emissions over time.

    Natural gas production from the Ghasha Concession is expected to begin around 2025, ramping up to over 1.5 billion standard cubic feet per day (SCFD) by the end of the decade. A total of four artificial islands have already been completed, and development drilling is underway. As part of the Ghasha Concession, ADNOC and its partners awarded two Engineering, Procurement & Construction (EPC) contracts last November. For the Hail and Ghasha project, they also awarded a contract for updating Front-End Engineering and Design (FEED). By the end of the year, the updated design will further optimize costs and timing, as well as potentially accelerate carbon capture integration.

    Share. Facebook Twitter Pinterest LinkedIn Reddit Email

    Related Posts

    Oil prices surge past $90 then retreat on market shifts

    August 3, 2026

    UK solar hits 22.8 GW ahead of plug-in solar rollout

    August 3, 2026

    India approves 84084 crore offshore oil gas exploration scheme

    August 1, 2026

    Statistics Canada reports 0.3% GDP growth in May

    August 1, 2026
    Latest News

    Oil prices surge past $90 then retreat on market shifts

    August 3, 2026

    Austria heatwave drives record high and €1.4bn damage

    August 3, 2026

    DR Congo faces its largest recorded Ebola outbreak

    August 3, 2026

    Trump halts planned Iran attack as deal talks advance

    August 3, 2026

    UK solar hits 22.8 GW ahead of plug-in solar rollout

    August 3, 2026
    © 2026 Saudi Independent | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.